You are here: Home » News » Company news » Brightlx‘s LED Lens Mold Loading Processing

Brightlx‘s LED Lens Mold Loading Processing

Views: 0     Author: Ina     Publish Time: 12-03-2024      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
sharethis sharing button

In the LED lens injection molding process, mold installation (i.e. mold loading) is a crucial step that directly affects the quality and production efficiency of the final product. The following are some key points of the Brightlx mold loading process:


1. Preparation before moldloading

Before loading the LED lens mold into the injection molding machine, the mold needs to be fully inspected. Make sure that all parts of the mold, including guide pins, guide sleeves, cooling system and heating system are in normal working condition. In addition, it is also necessary to confirm that the mold surface is not damaged and the various contact surfaces of the mold are clean and free of foreign matter. Lubrication and maintenance of the mold should also be completed at this stage.


2. Positioning and fixing of the mold

(Exactly as in the video, click this link for checking) https://youtube.com/shorts/tP3GK2bk_9Y?feature=share

Lift the LED optics mold above the injection molding machine to ensure that the mold is correctly aligned and securely fixed between the fixed plate and the moving plate of the injection molding machine. Auxiliary tools such as locating pins and locating rings can help the mold to be accurately positioned to ensure mold closing accuracy during the injection molding process.


3. Parameter setting of the injection molding machine

After the mold is fixed, the operator needs to set the various process parameters of the injection molding machine, such as injection pressure, injection speed, holding time and cooling time, according to the specifications and material requirements of the mold. The correct setting of these parameters has a direct impact on the molding quality.


4. Connection of cooling and heating systems

The cooling system and heating system on the mold are the keys to ensure molding temperature control. Operators need to carefully connect the cooling water pipes and heating pipes, and check whether all connections are tight and there is no water or air leakage. For complex molds, it may also be necessary to adjust multiple temperature control zones separately to achieve the optimal molding temperature.


5. Mold trial and adjustment

After the mold is installed, Brightlx engineers usually need to perform mold trial operations. This step can help find potential problems such as poor mold closure, insufficient injection or product defects. According to the mold trial results, the parameters of the mold and injection molding machine are fine-tuned to ensure the smooth progress of the final production process.


6. Final inspection before production
Before starting large-scale production, the injection molding machine and mold are checked for the final time to ensure that all parameters are set accurately, the mold is firmly installed, and each system is operating normally. This step is crucial and will directly affect the product quality and production efficiency of mass production.

The detailed description of the above steps demonstrates Brightlx's professionalism and precision in the mold assembly process, ensuring that each batch of products meets the highest standards.


If you are interested in injection mold or LED lens manufacturing, please feel free to start a communication with Brightlx. sales@lensblx.com


Content Menu
Brightlx Optics is a leading manufacturer focused on LED lens CUSTOMIZATION, we can offer LED lens design, Prototype, mold tooling, and injection service. We have been servicing more than 2500 client cases, with more than 150 long-term partners, each month R&D ability is 60 LED optics mold cases. So we have very rich experience and optics technology to support our customised market, we will think from the project to keep the optics solution is the best choice, and effective communication will help keep the project going smoothly.

QUICK LINKS

PRODUCTS

CONTACT US

Phone: +86 13714576491 (Jessica)
WhatsApp: +86 15224557331 (Ina)
Office Address: 409 Building C, Zone A, HuaMeiJu Business Center, BaoAn District, Shenzhen 518102 China
Factory Address: F Building,G Zone, GongHe Third Industry Park,Shajing, BaoAn District,Shenzhen 518104 China
Copyright ©  2024  Brightlx Ltd. All Rights Reserved.  Sitemap